Armstrong Lodge | Under Construction

A new home on a steep site above Kiama, arranged as two wings, living to the west, bedrooms to the east, stepping across three levels with the fall of the land.

 

We’ve been involved since the planning stage in 2023, working alongside Carlos Carrera and Studio Williams from early design through to construction, and carrying the project as the contact for consecutive Section 4.55 modifications on the NSW Planning Portal. That continuity matters on a site like this, decisions made on paper years ago have to hold true once you’re building into the slope.

 

The build begins below ground: deep retaining walls, stepped concrete set-outs and structural landscaping to establish the levels and stabilise the fall before the house takes shape in stone, render, concrete and metal roofing, delivered to a fully coordinated construction set and to BAL-40, BASIX and NatHERS.

 

The technical detailing is resolved with the architect and engineers as the work proceeds, carrying openings, keeping structure clear of the sight lines, and working through the hard junctions so the architecture reads as drawn.

 

Outside, a 30m pool area with a 20m lap pool and a 6m leisure pool, a cabana, boules court, fire pit, and plant room. Inside, custom joinery, designed lighting, and detailed ceiling and coffer work.

Status: Under Construction

 

Location: Saddleback Mountain, NSW

 

Project Type: New Build

 

Architect: Carlos Carrera and Studio Williams

 

Engineers: Northern Beaches Consulting

Check Out This Other Project

Ready to build your vision?

Let’s discuss your project requirements and how our builder-led process can deliver the results you expect.